Home » Fire Pump Set » DJ 500gpm@125psi fire pump package set – ZJBetter

DJ 500gpm@125psi fire pump package set – ZJBetter

Flow-500gpm; Head-125psi
DJ (diesel pump + jockey pump) Fire Pump Set
DJ Fire Pump Set The fire pump set consists of a pump connected to the diesel engine, pressure jockey pump, pressure vessel, controller for manual or automatic operation of the system and standard accessories mounted on the base. The fire pump system can be customized for different uses, such as high-rise buildings, facilities, hospitals, supermarkets, shopping malls, villas, apartments, etc.

Rated 5/5 based on 382 customer reviews
Share:
Previous:
Content

1. Diesel pump: the flow rate is the same as that of the electric pump. It connects pump sets with highly elastic couplings or universal joints.
2. jockey pump: vertical, small flow, higher lift than electric or diesel pumps.
3. Control panel: Automatically control the water pump with overload and overcurrent protection.
4. Accessories: suction pipe, discharge pipe with flange, battery, gate valve, check valve, flexible expansion joint, pressure switch, pressure gauge, base, etc.

Inquiry


    More Fire Pump Set

    When installing a fire pump, it is essential to adhere to specific requirements to ensure its proper functionality and compliance with safety standards. Here are some important installation requirements to consider:

    Codes and Standards: Familiarize yourself with local fire codes, regulations, and industry standards applicable to fire pump installations.

    Location and Accessibility: Choose an appropriate location for the fire pump that allows for easy access, maintenance, and serviceability.

    Foundation and Mounting: Ensure that the fire pump is installed on a stable and level foundation capable of supporting its weight and minimizing vibration.

    Electrical Connections: Electrical connections should be performed by licensed electricians following electrical codes and regulations.

    Water Supply: Ensure an adequate and reliable water supply for the fire pump.

    System Piping and Valves: The piping system should be installed following the pump manufacturer’s specifications and relevant standards.

    Controls and Monitoring: Install the pump’s control panel and associated instrumentation according to manufacturer guidelines.

    Testing and Commissioning: Thoroughly test and commission the fire pump system before placing it into service.

    Documentation and Training: Maintain comprehensive documentation of the installation, including drawings, equipment specifications, test reports, and maintenance records.

    It is crucial to consult with fire protection professionals, including fire engineers and pump manufacturers, to ensure compliance with all relevant requirements during the installation process. Proper installation is essential for the reliable operation of the fire pump and the safety of the facility and its occupants.